already did. "2-3 weeks, probably"
yep, iv'e has every one of their machines except the square B. sold my super 1050 here on TGT a few years ago. dammit. currently using a 550 but the old hands are getting too sore setting primers and seating 325 gr cast 45 colt slugs so i bit the bullet and ordered a 1100 in 45 colt and acp. not for the speed but mainly for ease of operation. my 1050 was SO DAMN EASY on me and the 1100 is supposed to be even better.Worth the wait..........
Does the 1100 still have the ratchet on the toolhead like the 1050?I’m not sure about sturdier. The 1100 is smoother than the 1050, for sure. I don’t know about one being easier to cycle than the other. The 1050 is already pretty easy to cycle. Even going slow, I can load 1000 9mm an hour.
not on the 1100s you don't. website says 6-8 weeks. or more. then today i get an email from dillon saying their heat treat plant had a fire delaying it even longer.That seems a little on the conservative side. I get orders from them in a week or so.
What’s wrong with that?...lighting farts at work...
nothing as long as you don't work in a gun powder factory!What’s wrong with that?