Our one-story house was built (by the seller) in 2020 on piers, we bought it in 2021, and a year ago, we had a big alcoved garden tub pulled out and a walk-in shower installed, with a narrow ledge along the back, and tile down to the new shower pan. Our mistake is that lower part was finished in tile, to match with the existing upper part of the alcove. Over this last week, there must have been major settling - because suddenly the lower part along the back is bowed, including the ledge, tile is off, total mess.
We have someone to come and do the repairs next Thursday - but I dont want to put tile back on because I know this house is going to continue to settle/shift - so I'm wondering if anyone has any ideas about some other something? that we can 'line' the back wall bottom part of the shower alcove with... that wont wreck the next time the house moves. We cant afford a re-build/re-tiling every two years. I've looked on youtube but without success.
Thanks -
We have someone to come and do the repairs next Thursday - but I dont want to put tile back on because I know this house is going to continue to settle/shift - so I'm wondering if anyone has any ideas about some other something? that we can 'line' the back wall bottom part of the shower alcove with... that wont wreck the next time the house moves. We cant afford a re-build/re-tiling every two years. I've looked on youtube but without success.
Thanks -