I think I've come to that conclusion too. I'm purchasing a MOE lower parts kit from PSA in FDE. After changing my mind a million times, I think I've settled on Midwest Industries SS 15'' rail in FDE too. Should have the upper + all the components within the next two-three weeks if everything works out.
This build came together way faster than I thought it would, thanks to a little bit of luck.
This build came together way faster than I thought it would, thanks to a little bit of luck.